Xingpeng Li

Publications and source records attributed to Xingpeng Li.

At least 19 recordsLinked to original sources

AC Assessment of DC Power Flow Screening for Data Center Hosting Capacity and Siting

A screening procedure based on direct current (DC) power flow estimates the data center hosting capacity of a candidate bus, termed the DC-screened capacity, and selects the generator commitment that supports it. This paper assesses that estimate under the alternating current (AC) network model. With the selected commitment fixed, an AC optimal power flow reoptimizes dispatch and voltages to find the largest data center load the bus can carry, termed the AC-assessed capacity. On a synthetic Texas system with 123 buses, the DC-screened capacity exceeds the AC-assessed capacity at 113 buses. Across all 123, the ratio of DC-screened to AC-assessed capacity has a median of 143% (a 43% overestimate) and a maximum of 1,070%. At these 113 buses, the DC-screened capacity violates a branch apparent power limit or a generator reactive power limit in the AC model, two limits the DC model omits. The overestimate changes decisions: a 1-GW project passes DC screening at every bus but exceeds the AC-assessed capacity at 37, and the bus ranked first by DC screening has 205.5 MW less AC-assessed capacity than the bus ranked second. Reporting the AC-assessed capacity beside each DC-screened capacity lets planners reject oversized projects or choose better sites.

eess.SY↗

Impact of Wind-Solar-Battery Growth on Electricity Prices: Reserve Scarcity and Transmission Congestion

This paper asks whether sequential wind, solar, and battery storage additions that eliminate unserved energy also remove modeled reserve scarcity and transmission congestion. Thirty-one cumulative portfolio states are evaluated on a modified IEEE 24-bus system for a constructed stressed day using a 24-hour day-ahead unit commitment model with network constraints, co-optimized energy and upward reserve, chronological battery storage, and an approximation of the Electric Reliability Council of Texas operating reserve demand curve. The thermal baseline has 106 MWh of unserved energy, whereas 450 MW of wind is sufficient to serve all demand. However, with 1,500 MW of wind, the hourly modeled reserve scarcity price still reaches \$5,000/MWh because wind output declines after the system peak. Adding 1,800 MW of solar reduces the load weighted daily average modeled reserve scarcity price from \$1,136.2/MWh to \$101.2/MWh and confines modeled reserve scarcity to three evening hours. Adding 250 MW/1,000 MWh of battery storage further lowers the average to \$4.3/MWh and reduces wind curtailment from 631 MWh to 306 MWh. Transmission congestion nevertheless remains: all residual wind curtailment occurs at bus 21, wind capture prices at buses 21 and 23 differ by \$31.8/MWh, and identical battery storage plants yield normalized net energy market revenues of \$201/(MW$\cdot$day) and \$121/(MW$\cdot$day) at buses 19 and 21, respectively. These results show that unserved energy, modeled reserve scarcity, and locational congestion effects measure distinct operating conditions and should be evaluated separately but interpreted together.

eess.SY↗

Graph Neural Network Prediction of Frequency Nadir and RoCoF Under Topology Variations

Accurate prediction of frequency dynamics under varying network topologies is essential for rapid frequency security assessment, whereas repeated electromagnetic transient (EMT) simulations are computationally intensive. This paper develops a topology-aware graph neural network with a radial basis function Kolmogorov-Arnold network (RBF-KAN) regression head, termed RK-GNN, to predict frequency nadir and maximum absolute rate of change of frequency (RoCoF). Scenarios combine load scaling, regional load redistribution, and generator redispatch with intact, N-1, and N-2 transmission topologies. After checks for network connectivity, generator reference limits, and numerical consistency, the retained scenarios are simulated in PSCAD to construct the reference dataset. The RK-GNN is evaluated against a conventional deep neural network (DNN) and a baseline GNN. On the IEEE 39-bus system, the RK-GNN reduces the mean absolute errors (MAEs) of nadir and RoCoF by 48% and 59% relative to the DNN and by 42% and 61% relative to the baseline GNN. Incorporating the bridge indicator and disturbance hop distance yields further MAE reductions of 27% and 54%. These results show that the proposed topology-aware architecture provides accurate prediction of both frequency metrics under varying topologies and substantially reduces the need for repeated EMT simulations.

eess.SY↗

Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with electromagnetic transient (EMT) simulation. During the capacity search, the UC model determines the economic dispatch for each tested data center capacity, and the resulting operating points are tested for settling with the generators committed online by the UC model and after a selected synchronous generator outage. Three nested capacities are obtained: the optimization-based steady-state capacity, the dynamic pre-outage capacity, and the post-outage dynamic capacity, each bounded by the previous one. On a test system with a detailed data center model, both dynamic capacities fall well below the optimization capacity, and the ranking of connection locations changes with the assessment stage and with the outage. In the most severe outage case at each candidate bus, the capacity is about 30% below the steady-state capacity. Thus, the dynamic response of the data center and the grid should be part of the hosting capacity assessment, and the comparison of connection locations should be made on the post-outage dynamic capacity.

eess.SY↗

Neural Network-Enhanced Frequency-Constrained Optimal Power Flow With Worst RoCoF and Frequency Deviation

Frequency-constrained optimal power flow (FCOPF) should keep the rate of change of frequency (RoCoF) and the frequency deviation (FD) within their limits after a specified generator out-age. The linearized frequency constraints commonly used in FCOPF are derived from aggregated system frequency response (SFR) models, which describe the center of inertia (COI) fre-quency with simplified governor dynamics and can underesti-mate the frequency excursions experienced by individual genera-tors. To address this issue, this paper develops a neural network-based frequency predictor (NN-FP) trained on electromagnetic transient (EMT) simulations in PSCAD/EMTDC. The NN-FP predicts the worst RoCoF and the worst FD over the monitored generators, namely the generators at all buses other than the contingency bus. The trained NN-FP is reformulated and embed-ded into FCOPF with tightened frequency limits obtained from the test set prediction errors of NN-FP, leading to the proposed NN-FCOPF. The proposed model is compared with a traditional optimal power flow and a linearized FCOPF. EMT validation of 24-hour dispatches on the IEEE 9-bus and 39-bus systems shows that NN-FCOPF satisfies both limits in all hourly cases for the specified contingency, whereas the linearized FCOPF violates the limits in some hours because it underestimates the worst genera-tor RoCoF and FD.

eess.SY↗

A Topology-Aware Neural Network for Fault Location With Missing Measurements

This paper proposes a topology-aware neural network-based fault locator (TANFL) for radial distribution feeders, which uses voltage and current phasors obtained after the decay of fault induced transients, as well as feeder connection relationships and line parameters, as inputs. The shared bus encoder, bus readout module, and gated line readout module work together to identify the faulty bus or line and estimate the continuous fault location on the selected line. During training, explicit missing data indicators and random bus data block masking are introduced, enabling a single trained model to handle both complete measurement sets and scenarios where any permitted bus measurement device fails. On the IEEE 15 bus feeder, this paper compares TANFL with a conventional multilayer perceptron (MLP) and the formula-based localization method under identical data, measurement availability scenarios, and evaluation metrics. On the test partition, TANFL outperforms the conventional MLP; with complete measurements, its line fault location performance is slightly lower than that of the formula-based method, but in the average results for scenarios with one missing bus measurement block, its accuracy is the highest among the three methods at a 5% tolerance.

eess.SY↗

Service-Aware Hosting Capacity Assessment of Edge Data Centers with Workload Flexibility

The growing demand for edge computing, content delivery, and AI services is driving the interconnection of edge data centers (DCs) with distribution networks. Before interconnection, utilities evaluate how much DC capacity can be accommodated without violating feeder current and voltage limits. Fixed peak load representations can overlook service dependent demand patterns, cooling related facility demand, and delay tolerant computing tasks. This paper develops a hosting capacity (HC) assessment model for edge DCs with shiftable workload scheduling. Three representative types are considered: mobile edge computing (MEC), content delivery network (CDN), and AI DCs. Facility demand is modeled by combining fixed base demand, service driven demand, prescribed cooling-overhead coefficient, and a shiftable workload component. Workload execution is optimized under arrival causality, maximum delay, daily energy balance constraints, and the resulting active and reactive loads are embedded in a distribution power flow model. Compared with the baseline without load shifting, the maximum bus level HC gain on the IEEE 33-bus system reaches 4.46% for MEC DCs and 9.89% for AI DCs, while CDN case shows negligible gain under the assumed cache management windows.

eess.SY↗

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

eess.SY↗

Impact of Security Modeling Fidelity on Hyperscale Data Center Hosting Capacity Assessment

This paper assesses hyperscale data center hosting capacity in transmission grids. Hosting capacity (HC) analysis quantifies the maximum additional load a bus can accommodate without violating operational constraints. This paper defines data center HC as the maximum time-invariant active power demand at a single target bus over a 24-hour peak-day horizon, and evaluates it under four models of increasing fidelity (i.e., the extent to which the model enforces real-world operational security requirements) on the modified IEEE 24-bus system: (i) DC optimal power flow (DC-OPF) without unit commitment (UC), (ii) basic SCUC (security-constrained unit commitment) without reliability constraints, (iii) SCUC with spinning reserve, and (iv) N-SCUC with both reserve and branch-contingency security. Comparing these models quantifies the impact of unit commitment, reserve requirements, and N-1 security on bus-level HC estimates. The N-SCUC yields an average HC of 444 MW; omitting N-1 security raises this to 532 MW, a 19.8% overestimation. The DC-OPF and basic SCUC models further overestimate HC, indicating a trade-off between model complexity and estimation accuracy.

eess.SY↗

Coordinated Conservation Voltage Reduction and Network Topology Reconfiguration in Active Distribution Networks

Distribution networks rely on conservation voltage reduction (CVR) and network topology reconfiguration (NTR) to manage demand, distributed energy resources (DERs), and tighter operating margins. Yet these strategies are typically deployed independently, despite coupled effects on feeder voltages, losses, and loading. This paper addresses that gap by developing a day-ahead mixed-integer second order cone programming (MISOCP) framework that jointly optimizes feeder head voltage control and network reconfiguration. The formulation incorporates AC branch flow constraints, ZIP load models, DERs, battery energy storage systems, and multi substation radiality. Using modified IEEE 33 bus and 123 bus systems, four configurations isolate the individual and coordinated effects of CVR and NTR. On the 33-bus system under mixed ZIP loading, NTR reduces active energy loss by 2.50%, while coordinated operation reduces it by 2.91% relative to SDN and produces a 2.46% CVR induced active load reduction relative to SDNTR. Under constant impedance loading, coordinated operation reduces active energy loss by 17.65% relative to SDN, while CVR reduces active load by 14.61% relative to SDNTR. DER portfolio scaling shows a nonmonotonic coordinated load reduction response, strongest at 20% penetration and decreasing at higher levels. On the 123 bus system, NTR reduces losses by 19.3%, while CVR reduces voltage dependent load energy by 2.3 to 2.4%. Under loading stress, SDN becomes infeasible at 120% loading, whereas CEDNTR remains feasible. Overall, the results demonstrate complementary, operating condition dependent benefits shaped by load composition, DER portfolio scaling, feeder topology, voltage margins, and source constraints, highlighting the value of joint optimization.

eess.SY↗

Active Power Thermal Feasibility Assessment of EV Integration with DER Scheduling and Distribution Network Reconfiguration

The rapid growth of electric vehicle (EV) adoption poses operational and economic challenges for distribution systems, including increased line loading and network congestion. As a practical near-term alternative to infrastructure reinforcement, distribution network topology reconfiguration (DNTR) can redistribute power flows, reduce operating costs, and improve operational flexibility. This paper presents a data driven operational feasibility framework for evaluating EV integration under increasing demand levels across four configurations: standard distribution network (SDN), SDN with DNTR (SDNTR), SDN with distributed energy resources (SDN-DER), and SDNTR with DERs (SDNTR-DER). Smart meter derived EV charging behavior is used to construct nodal EV demand profiles, which are incorporated into a mixed integer linear programming based active power screening model for a modified IEEE 33 bus distribution system. Feasibility is assessed with respect to nodal active power balance, line thermal limits, radiality and connectivity, DER limits, and BESS intertemporal operation. A bisection search identifies maximum active power thermal feasible EV demand levels of 51%, 68%, 85%, and 102% for SDN, SDN-DER, SDNTR, and SDNTR-DER, respectively. The 102% result represents full residential EV adoption with a 2% additional charging demand margin. At 0% EV penetration, SDNTR-DER reduces operating cost by 54% relative to SDN, representing the baseline economic value of coordinated DER scheduling and DNTR. The reported limits represent active power thermal feasibility boundaries rather than full AC hosting capacity limits.

eess.SY↗

Unlocking AI Data Center Interconnection Capacity Through Coordinated Grid and Data Center Flexibility

The rapid growth of AI data centers is creating concentrated electricity demands that can exceed available distribution network headroom and delay interconnection. This paper investigates whether capacity can be used effectively by coordinating flexibility on both sides of the interconnection. A day-ahead mixed integer second order cone programming framework maximizes feasible AI data center IT capacity using utility side conservation voltage reduction and network topology reconfiguration, together with data center workload shifting and reserve constrained uninterruptible power supply storage. Background feeder demand uses voltage dependent ZIP models, while the data center is modeled as constant power demand using Training, Inference, and Mixed workload profiles. A two-stage solution first maximizes interconnection capacity and then minimizes feeder losses for the retained capacity, with numerical relaxation screening. Studies on a 116-bus model derived from the IEEE 123-node feeder show that, at the constrained bus-60 connection point, grid side flexibility, driven almost entirely by network reconfiguration, increases feasible IT capacity by approximately 42.5-45.0%, while data center flexibility alone provides approximately 2.1-5.4% gains. Coordinated operation increases feasible IT capacity from approximately 10.5-10.6 MW under BASE operation to 15.3-16.0 MW, corresponding to gains of approximately 45.9-50.8%; the 16.0 MW Inference result is limited by the adopted UPS reserve requirement. Benefits are strongly location dependent and influenced by workload flexibility, deferral duration, PUE, UPS energy and reserve requirements, and feeder loading. Under a combined adverse operating condition, FULL capacity decreases by only 3.4% relative to the nominal Mixed case while retaining substantial additional capacity over BASE.

eess.SY↗

Generation and Transmission Expansion Planning with BESS-Based Virtual Transmission Lines

This paper proposes a mathematical model for long-term Generation and Transmission Expansion Planning (GTEP) that integrates a relaxed Virtual Transmission Line (VTL) as a Storage in Place of Transmission Asset (SIPTA) strategy to address challenges posed by transmission capacity shortages and system congestion in deregulated power markets, particularly under the rapid growth of renewable energy resources and integrated data centers. The proposed VTL formulation coordinates the operation of the two battery energy storage systems (BESSs) forming a VTL pair by preventing them from charging or discharging simultaneously, thereby providing additional congestion relief without introducing an explicit congestion cost into the objective function. Base case studies on a revised IEEE 24-bus system demonstrate that VTL reduces system congestion compared with the standalone BESS case, achieving a 12.3% reduction in weighted total congestion and up to approximately 67% reduction in congestion on individual transmission branches, with only a 0.3% increase in total planning cost. Furthermore, improvements across multiple congestion metrics indicate that the benefits of VTL extend beyond reducing congested line-hours to reducing congestion rent and N-1 transmission violations in the base case. These results demonstrate the potential of VTL to provide congestion mitigation that complements standalone BESS applications.

eess.SY↗

Assessing Modeling Fidelity for Long-Term Battery Energy Storage Planning: Operation, Degradation, and Temporal Representation

Long-term battery energy storage system (BESS) planning often relies on simplified degradation, operational, and temporal representations to maintain computational tractability, yet their effects on lifecycle conclusions are not well understood. This paper assesses the modeling fidelity needed for long-term lifecycle evaluation of BESS designs used in planning studies. A 20-year grid-connected microgrid is sized using a degradation-naive planning model, after which the installed portfolio is fixed and evaluated through sequential lifecycle validation. The reference representation combines nonlinear calendar and cycle aging, C-rate-dependent efficiencies, state-of-health-dependent performance, self-discharge, battery replacement, and full 8,760-h chronology. Battery-model hierarchies, targeted ablations, linear degradation surrogates, health-update intervals, temporal reductions, and combined simplifications are compared using lifecycle cost, replacement timing, state of health, and energy adequacy. The reference case produces replacements in years 9 and 18, a $111.25 million lifecycle net present cost, and 24.01 MWh of cumulative energy not served. Omitting calendar aging eliminates both replacements and understates lifecycle cost by 35.1%, whereas a separately calibrated linear surrogate model reproduces both replacement years and limits the cost deviation to 0.2%, although energy not served remains 31.8% below the reference. A peak-informed calibrated 12-day representation preserves replacement timing but reports zero energy not served, while replacing the preserved peak day with the maximum daily-energy-deficit day substantially overstates energy not served because representative-day closure alters the battery state surrounding the critical event. The results show that modeling fidelity is metric-dependent and should be selected according to the lifecycle outcome to be preserved.

eess.SY↗

Net Load Forecasting with Renewable Capacity Features: A Comparison of Direct and Indirect Neural Network Methods

Renewable energy adoption has increased significantly in recent years. However, the growing penetration of renewable generation that depends on the weather introduces additional variability, making accurate net load forecasting increasingly challenging. In this study, long short-term memory (LSTM) and fully connected neural network (FCNN) models are employed to forecast net load one hour ahead using direct and indirect approaches. In the direct approach, net load is predicted directly, whereas in the indirect approach, total load, wind generation, and solar generation are predicted separately and then used to derive net load. Installed renewable generation capacity is also incorporated as an input feature to capture changes in renewable generation capability over time. A 24-hour input window and a chronological 90%/5%/5% training, validation, and test split are employed, with preprocessing fitted exclusively on the training data. On 1,754 common test timestamps, the direct FCNN slightly outperforms the indirect FCNN, whereas the indirect LSTM achieves the best overall performance, with a MAPE of 2.46%, an RMSPE of 3.59%, and an R2 of 98.7%. These results demonstrate that component-wise forecasting can improve LSTM-based net load prediction when the characteristics of renewable generation and installed capacity information are represented appropriately.

eess.SY↗

BESS Siting and Sizing to Mitigate EV Charging-Induced Voltage Violations: A Planning Space Reduction Approach

The rapid growth of electric vehicle (EV) charging can cause persistent voltage violations in distribution networks and increase the need for grid-side voltage support. This paper develops a proactive voltage management framework for planning battery energy storage systems (BESS) to mitigate EV charging-induced voltage violations. Annual EV charging profiles are generated through Monte Carlo simulation using probability distributions derived from real charging events and are incorporated into an annual voltage assessment to identify stressed operating conditions. An optimal expansion planning model then determines installation locations and capacities at minimum investment cost. To improve computational tractability, a planning space reduction (PSR) strategy combines critical period selection to reduce the chronological horizon with candidate bus screening to reduce the BESS siting space. The resulting investment decisions are evaluated through full-year operational validation on the IEEE 33-bus, IEEE 69-bus, and a 240-bus distribution system. Results show that PSR reduces solution time by up to 99.2% while matching the exhaustive benchmark in the 33-bus and 69-bus systems and limiting the objective deviation to 0.55% in the 240-bus system. The optimized BESS deployments eliminate the identified annual voltage violations and further reduce electricity purchase costs and network energy losses under increasing EV penetration.

eess.SY↗

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

eess.SY↗

Degradation-Aware Lifecycle Planning of Microgrids with Second-Life Batteries through Reliability-Guided Refinement

Second-life batteries (SLBs) can reduce storage investment in microgrids, but their lower initial state of health and round-trip efficiency (RTE) can make degradation-naive sizing unreliable over long horizons. This paper develops DAVIR-MG, a degradation-aware validation and investment refinement framework for microgrid planning. A 20-year mixed-integer linear planning model determines installed capacities of dispatchable generation (DG), photovoltaic (PV) generation, and a battery energy storage system (BESS) using 365 days of hourly data. The portfolio is assessed through sequential lifecycle validation that accounts for PV degradation, battery capacity fade, RTE decline, and replacement. When validation identifies degradation-induced energy not served (ENS) above the prescribed tolerance, technology-specific refinement options are evaluated and compared using validated lifecycle cost. The framework is evaluated across tariff structures, PV degradation rates, new-BESS and SLB cases, degradation-mechanism ablation, technology-specific reliability refinements, Cost-ENS trade-offs, and SLB break-even conditions. Across seven cases, validated net present cost (NPC) exceeded planning NPC by 3.0%-11.6%, while adequacy shortfalls emerged only after year 13. In the selected SLB case, capacity fade alone accounted for 76.4% of cumulative ENS, RTE decline alone for 10.7%, and their interaction for the remaining 12.9%. BESS and DG refinements restored adequacy at nearly identical lifecycle cost but through different technical pathways. Under equal-reliability sizing, the minimum SLB discount required for cost parity increased from 22.9% to 35.7% when future replacement was priced at the new-BESS cost. DAVIR-MG provides a practical, industry-relevant, and computationally manageable framework for identifying degradation-induced adequacy risks and supporting informed lifecycle investment decisions.

eess.SY↗