arXiv ScienceSearch

arXiv subjects

U. Rotundo

Publications and source records attributed to U. Rotundo.

5 recordsLinked to original sources

DA{\Phi}NE -2023/24 Activity report

The DA{\Phi}NE operations during the last year have been devoted to deliver a statistically significant data sample to perform the first-ever measurement of kaonic deuterium X-ray transitions to the fundamental level. Operations for the SIDDHARTA-2 detector using a deuterium gas target started officially on the second half of May 2023, and have been organized in several runs here described.

physics.acc-ph

EuPRAXIA@SPARC_LAB Design study towards a compact FEL facility at LNF

On the wake of the results obtained so far at the SPARC\_LAB test-facility at the Laboratori Nazionali di Frascati (Italy), we are currently investigating the possibility to design and build a new multi-disciplinary user-facility, equipped with a soft X-ray Free Electron Laser (FEL) driven by a $\sim$1 GeV high brightness linac based on plasma accelerator modules. This design study is performed in synergy with the EuPRAXIA design study. In this paper we report about the recent progresses in the on going design study of the new facility.

physics.acc-ph

Da${\Phi}$ne developments for the KLOE-2 experimental run

Recently the peak luminosity achieved on the DA{\Phi}NE collider has been improved by almost a factor three by implementing a novel collision scheme based on large Piwinski angle and Crab-Waist. This encouraging result opened new perspectives for physics research and a new run with the KLOE-2 detector has been scheduled to start by spring 2010. The KLOE-2 installation is a complex operation requiring a careful design effort and a several months long shutdown. The high luminosity interaction region has been deeply revised in order to take into account the effect on the beam caused by the solenoidal field of the experimental detector and to ensure background rejection. The shutdown has been also used to implement several other modifications aimed at improving beam dynamics: the wiggler poles have been displaced from the magnet axis in order to cancel high order terms in the field, the feedback systems have been equipped with stronger power supplies and more efficient kickers and electrodes have been inserted inside the wiggler and the dipole vacuum chambers, in the positron ring, to avoid the e-cloud formation. A low level RF feedback has been added to the cavity control in both rings.

physics.acc-ph

Design considerations for future DAFNE upgrade

The Frascati F-Factory DAFNE has been delivering luminosity to the KLOE, DEAR and FINUDA experiments since year 2000. Since April 2004 the KLOE run has been resumed and recently peak luminosity of 1.0x1032 cm-2s-1 and integrated luminosity of 6.2 pb-1/day have been achieved. The scientific program of the three high-energy experiments sharing DAFNE operation will be completed approximately by the end of year 2006. A scientific program for DAFNE beyond that date has not been defined yet and it is matter of discussion in the high-energy physics and accelerator physics communities. In this paper we present some future scenarios for DAFNE, discussing the expected ultimate performances of the machine as it is now and addressing the design for an energy and/or luminosity upgrade. The options presented in the following are not exhaustive and they are intended to give a glance of what is doable using the existing infrastructures.

physics.acc-ph

DAFNE operation with the FINUDA experiment

DAFNE operation restarted in September 2003, after a six month shut-down for the installation of FINUDA, a magnetic detector dedicated to the study of hypernuclear physics. FINUDA is the third experiment running on DAFNE and operates while keeping on place the other detector KLOE. During the shut-down both Interaction Regions have been equipped with remotely controlled quadrupoles in order to operate at different solenoid fields. Among many other hardware upgrades one of the most significant is the reshaping of the wiggler pole profile to improve the field quality and the machine dynamic aperture. Commissioning of the collider in the new configuration has been completed in short time. The peak luminosity delivered to FINUDA has reached 6 10^31 s-1cm-2, with a daily integrated value close to 4 pb-1.

physics.acc-ph