arXiv ScienceSearch

arXiv subjects

T. Davenne

Publications and source records attributed to T. Davenne.

10 recordsLinked to original sources

Laboratory realization of relativistic pair-plasma beams

Relativistic electron-positron plasmas are ubiquitous in extreme astrophysical environments such as black holes and neutron star magnetospheres, where accretion-powered jets and pulsar winds are expected to be enriched with such pair plasmas. Their behaviour is quite different from typical electron-ion plasmas due to the matter-antimatter symmetry of the charged components and their role in the dynamics of such compact objects is believed to be fundamental. So far, our experimental inability to produce large yields of positrons in quasi-neutral beams has restricted the understanding of electron-positron pair plasmas to simple numerical and analytical studies which are rather limited. We present first experimental results confirming the generation of high-density, quasi-neutral, relativistic electron-positron pair beams using the 440 GeV/c beam at CERN's Super Proton Synchrotron (SPS) accelerator. The produced pair beams have a volume that fills multiple Debye spheres and are thus able to sustain collective plasma oscillations. Our work opens up the possibility of directly probing the microphysics of pair plasmas beyond quasi-linear evolution into regimes that are challenging to simulate or measure via astronomical observations.

physics.plasm-ph

Generating ultra-dense pair beams using 400 GeV/c protons

A previously unexplored experimental scheme is presented for generating low-divergence, ultra-dense, relativistic, electron-positron beams using 400 GeV/c protons available at facilities such as HiRadMat and AWAKE at CERN. Preliminary Monte-Carlo and Particle-in-cell simulations demonstrate the possibility of generating beams containing $10^{13}-10^{14}$ electron-positron pairs at sufficiently high densities to drive collisionless beam-plasma instabilities, which are expected to play an important role in magnetic field generation and the related radiation signatures of relativistic astrophysical phenomena. The pair beams are quasi-neutral, with size exceeding several skin-depths in all dimensions, allowing for the first time the examination of the effect of competition between transverse and longitudinal instability modes on the growth of magnetic fields. Furthermore, the presented scheme allows for the possibility of controlling the relative density of hadrons to electron-positron pairs in the beam, making it possible to explore the parameter spaces for different astrophysical environments.

physics.plasm-ph

TITUS: the Tokai Intermediate Tank for the Unoscillated Spectrum

The TITUS, Tokai Intermediate Tank for Unoscillated Spectrum, detector, is a proposed Gd-doped Water Cherenkov tank with a magnetised muon range detector downstream. It is located at J-PARC at about 2 km from the neutrino target and it is proposed as a potential near detector for the Hyper-Kamiokande experiment. Assuming a beam power of 1.3 MW and 27.05 x 10^{21} protons-on-target the sensitivity to CP and mixing parameters achieved by Hyper-Kamiokande with TITUS as a near detector is presented. Also, the potential of the detector for cross sections and Standard Model parameter determination, supernova neutrino and dark matter are shown.

physics.ins-det

FAFNIR: Strategy and risk reduction in accelerator driven neutron sources for fusion materials irradiation data

The need to populate the fusion materials engineering data base has long been recognized, the IFMIF facility being the present proposed neutron source for this purpose. Re-evaluation of the regulatory approach for the EU proposed DEMO device shows that the specification of the neutron source can be reduced with respect to IFMIF, allowing lower risk technology solutions to be considered. The justification for this approach is presented and a description of a proposed facility, FAFNIR, is presented with more detailed discussion of the accelerator and target designs.

physics.acc-ph

Reducing Risk and Accelerating Delivery of a Neutron Source for Fusion Materials Research

The materials engineering data base relevant to fusion irradiation is poorly populated and it has long been recognized that a fusion spectrum neutron source will be required, the facility IFMIF being the present proposal. Re- evaluation of the regulatory approach for the EU proposed DEMO device shows that the purpose of the source can be changed from lifetime equivalent irradiation exposure to data generation at lower levels of exposure by adopting a defence in depth strategy and regular component surveillance. This reduces the specification of the source with respect to IFMIF allowing lower risk technology solutions to be considered. A description of such a source, the Facility for Fusion Neutron Irradiation Research, FAFNIR, is presented here along with project timescales and costs.

physics.ins-det

The mass-hierarchy and CP-violation discovery reach of the LBNO long-baseline neutrino experiment

The next generation neutrino observatory proposed by the LBNO collaboration will address fundamental questions in particle and astroparticle physics. The experiment consists of a far detector, in its first stage a 20 kt LAr double phase TPC and a magnetised iron calorimeter, situated at 2300 km from CERN and a near detector based on a high-pressure argon gas TPC. The long baseline provides a unique opportunity to study neutrino flavour oscillations over their 1st and 2nd oscillation maxima exploring the $L/E$ behaviour, and distinguishing effects arising from $δ_{CP}$ and matter. In this paper we have reevaluated the physics potential of this setup for determining the mass hierarchy (MH) and discovering CP-violation (CPV), using a conventional neutrino beam from the CERN SPS with a power of 750 kW. We use conservative assumptions on the knowledge of oscillation parameter priors and systematic uncertainties. The impact of each systematic error and the precision of oscillation prior is shown. We demonstrate that the first stage of LBNO can determine unambiguously the MH to $>5σ$C.L. over the whole phase space. We show that the statistical treatment of the experiment is of very high importance, resulting in the conclusion that LBNO has $\sim$ 100% probability to determine the MH in at most 4-5 years of running. Since the knowledge of MH is indispensable to extract $δ_{CP}$ from the data, the first LBNO phase can convincingly give evidence for CPV on the $3σ$C.L. using today's knowledge on oscillation parameters and realistic assumptions on the systematic uncertainties.

hep-ph

The EUROnu Project

The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ- beams in a storage ring. The far detector in this case is a 100 kt Magnetised Iron Neutrino Detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular 6He and 18Ne, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive.

physics.acc-ph

The SPL-based Neutrino Super Beam

The EUROnu Super Beam work package has studied a neutrino beam based on SPL at CERN and aimed at MEMPHYS, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane (Fréjus tunnel, France), with a baseline of 130 km. The aim of this proposed experiment is to study the CP violation in the neutrino sector. In the study reported here, we have developed the conceptual design of the neutrino beam, especially the target and the magnetic focusing device. Indeed, this beam present several unprecedented challenges, like the high primary proton beam power (4 MW), the high repetition rate (50 Hz) and the low energy of the protons (4.5 GeV). The design is completed by a study of all the main component of the system, starting from the transport system to guide the beam to the target up to the beam dump.

physics.acc-ph

High-power targets: experience and R&D for 2 MW

High-power particle production targets are crucial elements of future neutrino and other rare particle beams. Fermilab plans to produce a beam of neutrinos (LBNE) with a 2.3 MW proton beam (Project X). Any solid target is unlikely to survive for an extended period in such an environment - many materials would not survive a single beam pulse. We are using our experience with previous neutrino and antiproton production targets, along with a new series of R&D tests, to design a target that has adequate survivability for this beamline. The issues considered are thermal shock (stress waves), heat removal, radiation damage, radiation accelerated corrosion effects, physics/geometry optimization and residual radiation.

physics.acc-ph

Interim Design Report

The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites should not be interpreted as implying a preferred choice of site for the facility.

hep-ex