arXiv ScienceSearch

arXiv subjects

Mathieu Cohen

Publications and source records attributed to Mathieu Cohen.

4 recordsLinked to original sources

The MICADO first-light imager for the ELT: first steps of the SCAO system MAIT

MICADO is the ELT first light instrument, an imager working at the diffraction limit of the telescope thanks to two adaptive optics (AO) modes: a single conjugate one (SCAO), available at the instrument first light and developed by the MICADO consortium, and a multi conjugate one (MCAO), developed by the MORFEO consortium. Although the project final design review process is about to be completed, the review board and ESO acknowledged that "the review of the final design can be considered complete for the majority of the MICADO sub-systems" and agreed that MICADO can start manufacturing. For the MICADO SCAO module, we have started the manufacturing of several parts: the majority of the SCAO optics and of the SCAO mechanics, the real-time computer software and the instrument control software. This manufacturing is ordered in several steps to allow the progressive integration of a first full AO close loop with the final SCAO parts. In this contribution, we will focus on the first two steps: on our AO S\'esame bench and the so-called "beta flat configuration". We will present the status of this manufacturing and the first results obtained.

astro-ph.IM

The MICADO first light imager for the ELT: the SCAO module AIT in France, from the beta flat configuration towards the flat and final configurations

MICADO is the designated ELT first light instrument, a near-infrared imager working at the diffraction limit of the telescope thanks to a SCAO and an MCAO mode. Since summer 2024, MICADO is in its AIT phase and all MICADO partners are currently integrating their subsystems. The MICADO SCAO module will follow three successive AIT phases in France: the beta flat configuration, the flat configuration and the final configuration. In this contribution I will first present the progress made in the AIT of the beta flat configuration and its closed loop results. I will then present the performed and on-going tasks for the flat and final configurations (manufacturing, delivery and integration of several SCAO subsystems and pieces of software) and the results obtained so far in the flat configuration. I will then conclude with the expected following steps of the SCAO module AIT in Garching.

astro-ph.IM

The MICADO first light imager for the ELT: overview, operation, simulation

MICADO will enable the ELT to perform diffraction limited near-infrared observations at first light. The instrument's capabilities focus on imaging (including astrometric and high contrast) as well as single object spectroscopy. This contribution looks at how requirements from the observing modes have driven the instrument design and functionality. Using examples from specific science cases, and making use of the data simulation tool, an outline is presented of what we can expect the instrument to achieve.

astro-ph.IM

4MOST - 4-metre Multi-Object Spectroscopic Telescope

The 4MOST consortium is currently halfway through a Conceptual Design study for ESO with the aim to develop a wide-field (>3 square degree, goal >5 square degree), high-multiplex (>1500 fibres, goal 3000 fibres) spectroscopic survey facility for an ESO 4m-class telescope (VISTA). 4MOST will run permanently on the telescope to perform a 5 year public survey yielding more than 20 million spectra at resolution R~5000 ({\lambda}=390-1000 nm) and more than 2 million spectra at R~20,000 (395-456.5 nm & 587-673 nm). The 4MOST design is especially intended to complement three key all-sky, space-based observatories of prime European interest: Gaia, eROSITA and Euclid. Initial design and performance estimates for the wide-field corrector concepts are presented. We consider two fibre positioner concepts, a well-known Phi-Theta system and a new R-Theta concept with a large patrol area. The spectrographs are fixed configuration two-arm spectrographs, with dedicated spectrographs for the high- and low-resolution. A full facility simulator is being developed to guide trade-off decisions regarding the optimal field-of-view, number of fibres needed, and the relative fraction of high-to-low resolution fibres. Mock catalogues with template spectra from seven Design Reference Surveys are simulated to verify the science requirements of 4MOST. The 4MOST consortium aims to deliver the full 4MOST facility by the end of 2018 and start delivering high-level data products for both consortium and ESO community targets a year later with yearly increments.

astro-ph.IM