arXiv ScienceSearch

arXiv subjects

K. Furukawa

Publications and source records attributed to K. Furukawa.

11 recordsLinked to original sources

First Experimental Demonstration of Beam Storage by Three-Dimensional Spiral Injection Scheme for Ultra-Compact Storage Rings

Three-dimensional spiral injection enables beam storage in ultra-compact rings with nanosecond revolution periods. We report first storage of a $297 \, \mathrm{keV/}c$ electron beam in a $22 \,\mathrm{cm}$ weak-focusing ring with a $4.7\,\mathrm{ns}$ revolution period using a $140\,\mathrm{ns}$ kicker pulse. A scintillating-fiber detector observes signals $>5σ$ above noise for $\geq 1\, \mathrm{μs}$, and varying the weak-focusing field potential shifts the stored-beam region, consistent with Monte Carlo predictions, validating beam storage. This proof-of-principle opens a path to ultra-compact storage rings for next-generation precision measurements.

physics.acc-ph

Development of an intense positron source using a crystal--amorphous hybrid target for linear colliders

In a conventional positron source driven by a few GeV electron beam, a high amount of heat is loaded into a positron converter target to generate intense positrons required by linear colliders, and which would eventually damage the converter target. A hybrid target, composed of a single crystal target as a radiator of intense gamma--rays, and an amorphous converter target placed downstream of the crystal, was proposed as a scheme which could overcome the problem.This paper describes the development of an intense positron source with the hybrid target. A series of experiments on positron generation with the hybrid target has been carried out with a 8--GeV electron beam at the KEKB linac. We observed that positron yield from the hybrid target increased when the incident electron beam was aligned to the crystal axis and exceeded the one from the conventional target with the converter target of the same thickness, when its thickness is less than about 2 radiation length. The measurements in the temperature rise of the amorphous converter target was successfully carried out by use of thermocouples. These results lead to establishment to the evaluation of the hybrid target as an intense positron source.

physics.acc-ph

13C NMR study of the magnetic properties of the quasi-one-dimensional conductor, (TMTTF)2SbF6

Magnetic properties in the quasi-one-dimensional organic salt (TMTTF)2SbF6 are investigated by 13C NMR under pressures. Antiferromagnetic phase transition at ambient pressure (AFI) is confirmed. Charge-ordering is suppressed by pressure and is not observed under 8 kbar. For 5 < P < 20 kbar, a sharp spectrum and the rapid decrease of the spin-lattice relaxation rate 1/T1 were observed below about 4 K, attributed to a spin-gap transition. Above 20 kbar, extremely broadened spectrum and critical increase of 1/T1 were observed. This indicates that the system enters into another antiferromagnetic phase (AFII) under pressure. The slope of the antiferromagnetic phase transition temperature T_AFII, dT_AFII/dP, is positive, while T_AFI decreases with pressure. The magnetic moment is weakly incommensurate with the lattice at 30 kbar.

cond-mat.str-el

Belle II Technical Design Report

The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.

physics.ins-det

Compensation of the Crossing Angle with Crab Cavities at KEKB

Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.

physics.ins-det

Beam Feedback Systems and BPM Read-out System for the Two-Bunch Acceleration at Kekb Linac

In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and orbit of each bunch is indispensable. Thus the beam energy and orbit feedback systems have been upgraded. Since beam characteristics are acquired through beam position monitors (BPM), their read-out system was improved to meet two-bunch requirements. Combined waveforms from BPM's were adjusted with delay cables avoiding overlaps and they enabled simultaneous measurement of beam positions of two bunches. The beam energies of two bunches were balanced by tuning rf pulse timings, and the average energy was stabilized by adjusting the accelerating rf phases. The average beam orbits were also stabilized. Slow feedback systems at the injector section for charge and bunching stabilities are being planned as well. These systems were used successfully in the test beams and will be employed in the routine operation.

physics.acc-ph

Implementation of the Epics Device Support for Network-Based Controllers

In the control system of the JAERI-KEK joint project (High Intensity Proton Accelerator Facility), it is planned to employ network-based controllers such as PLC's and measurement stations instead of using other field control networks, since the network hardware and software can be standardized and they have been successfully utilized in other accelerator control systems in KEK. EPICS software support for those controllers was designed paying special attention to robustness and has been implemented and applied for the accelerator test stand. Basic functionalities were confirmed and miscellaneous functions such as diagnosis of the software itself would be added. Since many kinds of network-based equipment such as oscilloscopes have become available recently, they are considered to be integrated as well. They may enable more manageable controllers.

physics.acc-ph

Introduction of Modern Subsystems at the KEK Injector-linac

As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix workstations and VME computers since 1993. During the eight-year operation, we extended the system by introducing a) Windows PCs, b) PLC controllers with a network interface, and c) web servers based on modern information technology. Although such new subsystems are essential to improve control functionalities, they often cause communication problems with the original control system. We discuss the experienced problems, and present our solutions for them.

physics.acc-ph

A Control System of the Joint-Project Accelerator Complex

The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.

physics.acc-ph

Towards Reliable Acceleration of High-energy and High-intensity Electron Beams

KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch up to 3.7-GeV for positron generation. This could be classified as one of the brightest S-band linac's. Since the KEKB rings were completed in December 1998, those 3.5-GeV position and 8-GeV electron beams have been injected with an excellent performance. Moreover, we have succeeded in switching among the high-intensity beams for KEKB and beams for two SOR rings with sufficient reproducibility. After the commissioning of the KEKB ring started, we have launched a project to stabilize the intensity and quality of the high-current beams furthermore, and have accomplished it investigating every conceivable aspect.

physics.acc-ph

Beam Switching and Beam Feedback Systems at KEKB Linac

The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning. A software panel is used to choose one of four beam modes and a switching sequence is executed in about two minutes. Most items in a sequence are simple operations followed by failure recoveries. The magnet standardization part consumes most of the time. The sequence can be re-arranged easily by accelerator operators. Linac beam modes are switched about fifty times a day using this software. In order to stabilize linac beam energy and orbits, as well as some accelerator equipment, about thirty software beam feedback loops have been installed. They have been utilized routinely in all beam modes, and have improved its beam quality. Since its software interfaces are standardized, it is easy to add new feedback loops simply defining monitors and actuators.

physics.acc-ph