arXiv ScienceSearch

arXiv subjects

Hans Kellerer

Publications and source records attributed to Hans Kellerer.

2 recordsLinked to original sources

Asymmetric Weighted Earliness-Tardiness: Scheduling with a Nonrestrictive Common Due Date

Single-machine asymmetric weighted earliness--tardiness (AWET) scheduling asks how to sequence jobs around a common synchronization date when early and late completion incur unrelated job-dependent penalties. At the boundary nonrestrictive date $d=\sum_jp_j$, a compact V-shaped schedule reduces the continuous-time problem to a quadratic choice of a nonempty early set. We establish four complementary results for this model. First, the positive-integer problem is strongly NP-complete by a unary-polynomial reduction from Restricted Exact Cover by 3-Sets. Second, unrestricted AWET admits a polynomial-time $(3+2\sqrt2+\varepsilon)$-approximation based on an anchored semidefinite relaxation and deterministic marginal thresholding. Third, when the earliness and tardiness ratio orders are strict reversals, the problem is weakly NP-complete but has an exact two-resource pseudopolynomial dynamic program. Fourth, for fixed total refinements whose ratio permutation is separable, an exact separating-tree recurrence and coordinated geometric trimming yield an FPTAS. The proofs use different manifestations of the same canonical objective: scale-separated prefix penalties, positive-semidefinite minimum-kernel covariance, a dominant completed load square, and a bounded four-coordinate decomposition interface. Together, the results show that the decisive issue is not merely whether the two ratio orders agree, but whether their interaction can be controlled by a global certificate or compressed into a bounded constructive interface.

math.OC

Approximation Schemes for Minimizing the Maximum Lateness on a Single Machine with Release Times under Non-Availability or Deadline Constraints

In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto frontier with respect to the two objective functions maximum lateness and makespan. The third problem is associated with a non-availability constraint. In the fourth one, the non-availibility interval is related to the operator who is organizing the execution of jobs on the machine (no job can start, and neither can complete during the operator non-availability period). For each of the four problems, we establish the existence of a polynomial time approximation scheme (PTAS).

cs.DS