arXiv ScienceSearch

arXiv subjects

Hairong Zhao

Publications and source records attributed to Hairong Zhao.

5 recordsLinked to original sources

Minimizing Makespan in Sublinear Time via Weighted Random Sampling

We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$ is known and the other for the case where $n$ is unknown. Both algorithms not only give a $(1+3\epsilon)$-approximation to the optimal makespan but also generate a sketch schedule. Our first algorithm, which targets the case where $n$ is known and draws samples in a single round under weighted random sampling, has a running time of $\tilde{O}(\tfrac{m^5}{\epsilon^4} \sqrt{n}+A(\ceiling{m\over \epsilon}, {\epsilon} ))$, where $A(\mathcal{N}, \alpha)$ is the time complexity of any $(1+\alpha)$-approximation scheme for the makespan minimization of $\mathcal{N}$ jobs. The second algorithm addresses the case where $n$ is unknown. It uses adaptive weighted random sampling, %\textit{that is}, it draws samples in several rounds, adjusting the number of samples after each round, and runs in sublinear time $\tilde{O}\left( \tfrac{m^5} {\epsilon^4} \sqrt{n} + A(\ceiling{m\over \epsilon}, {\epsilon} )\right)$. We also provide an implementation that generates a weighted random sample using $O(\log n)$ uniform random samples.

cs.DS

Sublinear Approximation Schemes for Scheduling Precedence Graphs of Bounded Depth

We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation algorithms that use only sublinear space or sublinear time. We develop the first one-pass streaming approximation schemes using sublinear space when all jobs' processing times differ no more than a constant factor $c$ and the number of machines $m$ is at most $\tfrac {2n \epsilon}{3 h c }$. This is so far the best approximation we can have in terms of $m$, since no polynomial time approximation better than $\tfrac{4}{3}$ exists when $m = \tfrac{n}{3}$ unless P=NP. %the problem cannot be approximated within a factor of $\tfrac{4}{3}$ when $m = \tfrac{n}{3}$ even if all jobs have equal processing time. The algorithms are then extended to the more general problem where the largest $\alpha n$ jobs have no more than $c$ factor difference. % for some constant $0 < \alpha \le 1$. We also develop the first sublinear time algorithms for both problems. For the more general problem, when $ m \le \tfrac { \alpha n \epsilon}{20 c^2 \cdot h } $, our algorithm is a randomized $(1+\epsilon)$-approximation scheme that runs in sublinear time. This work not only provides an algorithmic solution to the studied problem under big data % and cloud computing environment, but also gives a methodological framework for designing sublinear approximation algorithms for other scheduling problems.

cs.DS

Streaming Algorithms for Multitasking Scheduling with Shared Processing

In this paper, we design the first streaming algorithms for the problem of multitasking scheduling on parallel machines with shared processing. In one pass, our streaming approximation schemes can provide an approximate value of the optimal makespan. If the jobs can be read in two passes, the algorithm can find the schedule with the approximate value. This work not only provides an algorithmic big data solution for the studied problem, but also gives an insight into the design of streaming algorithms for other problems in the area of scheduling.

cs.DS

Streaming Approximation Scheme for Minimizing Total Completion Time on Parallel Machines Subject to Varying Processing Capacity

We study the problem of minimizing total completion time on parallel machines subject to varying processing capacity. In this paper, we develop an approximation scheme for the problem under the data stream model where the input data is massive and cannot fit into memory and thus can only be scanned for a few passes. Our algorithm can compute the approximate value of the optimal total completion time in one pass and output the schedule with the approximate value in two passes.

cs.DS

Multitasking Scheduling with Shared Processing

Recently, the problem of multitasking scheduling has attracted a lot of attention in the service industries where workers frequently perform multiple tasks by switching from one task to another. Hall, Leung and Li (Discrete Applied Mathematics 2016) proposed a shared processing multitasking scheduling model which allows a team to continue to work on the primary tasks while processing the routinely scheduled activities as they occur. The processing sharing is achieved by allocating a fraction of the processing capacity to routine jobs and the remaining fraction, which we denote as sharing ratio, to the primary jobs. In this paper, we generalize this model to parallel machines and allow the fraction of the processing capacity assigned to routine jobs to vary from one to another. The objectives are minimizing makespan and minimizing the total completion time. We show that for both objectives, there is no polynomial time approximation algorithm unless P=NP if the sharing ratios are arbitrary for all machines. Then we consider the problems where the sharing ratios on some machines have a constant lower bound. For each objective, we analyze the performance of the classical scheduling algorithms and their variations and then develop a polynomial time approximation scheme when the number of machines is a constant.

cs.DS