arXiv ScienceSearch

arXiv subjects

H. Witte

Publications and source records attributed to H. Witte.

7 recordsLinked to original sources

The DarkLight Experiment at TRIUMF

This paper reports on the commissioning of the DarkLight experiment at the ARIEL superconducting electron linear accelerator located at TRIUMF in Vancouver, Canada. DarkLight was designed to utilize the ARIEL electron beam to search for a new boson, $A^\prime$, which preferentially couples to leptons, with a mass in the range 13-17 MeV/$c^2$. Such a boson could be produced via the $e^-~X\rightarrow e^-~X~A^\prime$ process, and the resulting $A^\prime\rightarrow e^+~e^-$ decay used to reconstruct the invariant mass of the $A^\prime$. The $e^+e^-$ pair is detected using a pair of magnetic spectrometers. Each spectrometer is instrumented with two triple GEM detectors and a scintillating strip hodoscope to trigger the event readout. Electron beam energies between 10 and 30 MeV were used to commission the experiment with a 1$~\mu$m thick carbon target. With both spectrometer polarities set to select electrons, elastic and M{\o}ller scattering were used to examine detector performance and compare with predicted distributions from Monte Carlo simulations. Planned upgrades to the e-linac will allow searches to be made with beam energies up to 50 MeV using a 1$~\mu$m thick tantalum target.

physics.ins-det

Design concept for the second interaction region for Electron-Ion Collider

The possibility of two interaction regions (IRs) is a design requirement for the Electron Ion Collider (the EIC). There is also a significant interest from the nuclear physics community in a 2nd IR with measurements capabilities complementary to those of the first IR. While the 2nd IR will be in operation over the entire energy range of ~20GeV to ~140GeV center of mass (CM). The 2nd IR can also provide an acceptance coverage complementary to that of the first. We present a brief overview and the current progress of the 2nd IR design in terms of the parameters, magnet layout, and beam dynamics.

physics.acc-ph

Cost-benefit analysis for commissioning decisions in GEO600

Gravitational wave interferometers are complex instruments, requiring years of commissioning to achieve the required sensitivities for the detection of gravitational waves, of order 10^-21 in dimensionless detector strain, in the tens of Hz to several kHz frequency band. Investigations carried out by the GEO600 detector characterisation group have shown that detector characterisation techniques are useful when planning for commissioning work. At the time of writing, GEO600 is the only large scale laser interferometer currently in operation running with a high duty factor, 70%, limited chiefly by the time spent commissioning the detector. The number of observable gravitational wave sources scales as the product of the volume of space to which the detector is sensitive and the observation time, so the goal of commissioning is to improve the detector sensitivity with the least possible detector down time. We demonstrate a method for increasing the number of sources observable by such a detector, by assessing the severity of non-astrophysical noise contaminations to efficiently guide commissioning. This method will be particularly useful in the early stages and during the initial science runs of the aLIGO and adVirgo detectors, as they are brought up to design performance.

gr-qc

Accelerator system for the PRISM based muon to electron conversion experiment

The next generation of lepton flavor violation experiments need high intensity and high quality muon beams. Production of such beams requires sending a short, high intensity proton pulse to the pion production target, capturing pions and collecting the resulting muons in the large acceptance transport system. The substantial increase of beam quality can be obtained by applying the RF phase rotation on the muon beam in the dedicated FFAG ring, which was proposed for the PRISM project.This allows to reduce the momentum spread of the beam and to purify from the unwanted components like pions or secondary protons. A PRISM Task Force is addressing the accelerator and detector issues that need to be solved in order to realize the PRISM experiment. The parameters of the required proton beam, the principles of the PRISM experiment and the baseline FFAG design are introduced. The spectrum of alternative designs for the PRISM FFAG ring are shown. Progress on ring main systems like injection and RF are presented. The current status of the study and its future directions are discussed.

physics.acc-ph

Test of a 1.8 Tesla, 400 Hz Dipole for a Muon Synchrotron

A 1.8 T dipole magnet using thin grain oriented silicon steel laminations has been constructed as a prototype for a muon synchrotron ramping at 400 Hz. Following the practice in large 3 phase transformers and our own Opera-2d simulations, joints are mitred to take advantage of the magnetic properties of the steel which are much better in the direction in which the steel was rolled. Measurements with a Hysteresigraph 5500 and Epstein frame show a high magnetic permeability which minimizes stored energy in the yoke allowing the magnet to ramp quickly with modest voltage. Coercivity is low which minimizes hysteresis losses. A power supply with a fast Insulated Gate Bipolar Transistor (IGBT) switch and a capacitor was constructed. Coils are wound with 12 gauge copper wire. Thin wire and laminations minimize eddy current losses. The magnetic field was measured with a peak sensing Hall probe.

physics.acc-ph

MICE: the Muon Ionization Cooling Experiment. Step I: First Measurement of Emittance with Particle Physics Detectors

The Muon Ionization Cooling Experiment (MICE) is a strategic R&D project intended to demonstrate the only practical solution to providing high brilliance beams necessary for a neutrino factory or muon collider. MICE is under development at the Rutherford Appleton Laboratory (RAL) in the United Kingdom. It comprises a dedicated beamline to generate a range of input muon emittances and momenta, with time-of-flight and Cherenkov detectors to ensure a pure muon beam. The emittance of the incoming beam will be measured in the upstream magnetic spectrometer with a scintillating fiber tracker. A cooling cell will then follow, alternating energy loss in Liquid Hydrogen (LH2) absorbers to RF cavity acceleration. A second spectrometer, identical to the first, and a second muon identification system will measure the outgoing emittance. In the 2010 run at RAL the muon beamline and most detectors were fully commissioned and a first measurement of the emittance of the muon beam with particle physics (time-of-flight) detectors was performed. The analysis of these data was recently completed and is discussed in this paper. Future steps for MICE, where beam emittance and emittance reduction (cooling) are to be measured with greater accuracy, are also presented.

physics.acc-ph

A Cost-Effective Design for a Neutrino Factory

There have been active efforts in the U.S., Europe, and Japan on the design of a Neutrino Factory. This type of facility produces intense beams of neutrinos from the decay of muons in a high energy storage ring. In the U.S., a second detailed Feasibility Study (FS2) for a Neutrino Factory was completed in 2001. Since that report was published, new ideas in bunching, cooling and acceleration of muon beams have been developed. We have incorporated these ideas into a new facility design, which we designate as Study 2B (ST2B), that should lead to significant cost savings over the FS2 design.

physics.acc-ph