Fast and Accurate Hydro Unit Commitment

We introduce a fast novel algorithm to commit hydro-generators. We show that our algorithm can commit 56 generators for 200 days 10,000 times faster than Hexaly, the leading commercial solver for scheduling problems, without sacrificing solution quality. Our method can commit 1792 generators for an entire year in approximately 20 seconds on commodity hardware. Hexaly is unable to solve problems of this size in reasonable time. We attain this runtime improvement by introducing a greedy-heuristic tailored for hydro units. We provide a direction for a possible proof that the error our solver makes decreases with the problem size. This is supported by our experimental results. We prove that our solver's runtime scales log-linearly in the number of generators and time periods.

math.OC↗

Fast Relax-and-Round Unit Commitment with Economic Horizons

The US energy system is under increasing pressure to serve expanding data centers loads and to accommodate a larger number of generating units with varying technologies and ownership structures. Therefore, developing new unit commitment (UC) methods remains a priority for reliable and affordable grid operations. We expand our novel computational method for UC to include ramping constraints and long-horizon planning, and provide a theoretical bound on its accuracy. We solve problems with thousands of generators at 5-minute market intervals. We show that our method can solve UC problems with over 20,000 generators in approximately 10 seconds on commodity hardware and that an increased planning horizon leads to sizable op- erational cost savings. This is twice as fast as the leading commercial solver, Gurobi. The gap increases when adding more constraints. Our method can be implemented using existing continuous optimization solvers and adapted for different applications. We prove a bound on the error of these solvers and show that it vanishes (in relative terms) as the problem becomes larger. Our novel algorithm could allow an operator to make horizon-aware economic decisions for large systems.

math.OC↗

On Extensions of the Unanimous Vote Problem

The Unanimous Vote problem is to determine a fixed order in which to flip each of $n$ biased coins, where each coin can be flipped only once, such that the expected number of flips until seeing both a head and a tail (or flipping all coins) is minimized. Duman Keles et al. (arXiv:2510.16678 [cs.DS]) gave an $\mathcal{O}(n \log n)$-time algorithm for this problem. Extensions of the Unanimous Vote problem are a rich source of stochastic optimization problems. We focus on three: (1) a variant in which each coin can be flipped arbitrarily many times (a solution is thus an infinite sequence of coin choices), (2) a generalization with $d$-sided dice, that can each be rolled once, where dice must be rolled until two different outcomes are observed (or all dice have been rolled), and (3) a different generalization with $d$-sided dice, where dice must be rolled until all $d$ outcomes have been observed. For (1), we show that there is an optimal sequence which follows a simple greedy rule; the same rule only gives a 1-additive approximation for the original problem (arXiv:2510.16678 [cs.DS]). The rule also yields a correspondence between a particular optimal sequence and a related mechanical word, which we exploit to characterize the conditions under which this optimal sequence is periodic. We establish tight multiplicative and additive adaptivity gaps for this variant. For (2), we show that two different generalizations of the greedy rule from (arXiv:2510.16678 [cs.DS]) can be combined to obtain a PTAS. For (3), we give an $\mathcal{O}(\log d)$-approximation algorithm by reducing the problem to Submodular Ranking (arXiv:1007.2503 [cs.DS]); the same reduction technique can be used to yield approximation algorithms for other stochastic probing problems. Finally, we pose a number of related open questions.

cs.DS↗

Fast Relax-and-Round Unit Commitment with Topological Constraints

Recent developments in the US knowledge economy have created a significant growth in datacenter loads, with two major consequences for power generation. First, to compensate for growth in load, datacenters are encouraged to bring their own generating units. Second, in search of the remaining pools of dispatchable generation, utilities are increasingly turning to subtransmission and distribution level generating assets. Coupled with increasing loads and the resulting tighter grid conditions, both trends are likely to create a need to commit a large number of localized generating units under grid constraints. We propose an extension of Relax-and- Round Unit Commitment (RRUC) that is capable of committing generating units for larger problems faster than conventional methods, while staying within intertemporal and spatial MVA constraints. We demonstrate the performance of RRUC using synthetic congestible test systems ranging from 100 to 20,000 buses. RRUC consistently finds low cost solutions, independent of the problem size, and its run time increases sub-quadratically in the number of buses. RRUC can solve the 100 bus system in less than a second and the 20,000 bus system 7 minutes. In contrast, a leading state of the art solver cannot find a feasible solution to the 100 bus system in 15 minutes.

math.OC↗

Dynamic Operational Reserve Margin Assessment from Risk-Constrained Unit Commitment States

We propose Dynamic Reserve Margin (DRM) as a time-varying operational adequacy metric derived from risk-constrained unit commitment (RCUC) states. DRM quantifies reserve adequacy using the additional generation capacity that committed generators can provide within a 5-minute response window relative to uncertainty and contingency reserve requirements. We introduce a complementary Reserve Risk Envelope (RRE) metric to quantify operational reserve headroom in directly interpretable MW terms. A low-margin duration metric is further developed to quantify the persistence of reserve stress over an operating horizon. We use an IEEE 14-bus example to illustrate these concepts, followed by large-scale RCUC case studies under multiple operating scenarios. Results demonstrate that reserve requirements and ramp-accessible reserve capability can vary substantially across operating conditions, and that commitment decisions adapt to maintain reserve adequacy under changing system conditions. The proposed DRM and RRE metrics provide an interpretable operational characterization of reserve adequacy, reveal reserve accessibility and stress persistence that are not captured by conventional reserve margin metrics.