arXiv ScienceSearch

arXiv subjects

D. Proch

Publications and source records attributed to D. Proch.

3 recordsLinked to original sources

Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023

In 2005 and 2006, we began to consider the feasibility of long-pulse (LP) and continuous-wave (CW) operation for the E-XFEL. The operation modes considered were assumed to be complementary to the short-pulse operation (SP), with ~1 ms RF pulses and a 10 Hz repetition rate, which at that time had already been chosen and presented in the TDR [1] of the E-XFEL facility. This operation mode originated from the previously proposed linear collider TESLA project [2]. We initiated several R&D programmes in 2005 and 2006 to enable operation modes with a duty factor significantly higher than that of the short-pulse mode, which is still approximately 1%. In this report, we briefly present the initiated R&D programmes and their results, with particular emphasis on the results of the E- XFEL cryomodule tests, which led to minor modifications of the design and subsequently to the implementation of these cryomodules in large-scale X-ray FEL facilities.

physics.acc-ph

Achievement of 35 MV/m in the Superconducting Nine-Cell Cavities for TESLA

The Tera Electronvolt Superconducting Linear Accelerator TESLA is the only linear electron-positron collider project based on superconductor technology for particle acceleration. In the first stage with 500 GeV center-of-mass energy an accelerating field of 23.4 MV/m is needed in the superconducting niobium cavities which are operated at a temperature of 2 K and a quality factor Q0 of 10 to the 10. This performance has been reliably achieved in the cavities of the TESLA Test Facility (TTF) accelerator. The upgrade of TESLA to 800 GeV requires accelerating gradients of 35 MV/m. Using an improved cavity treatment by electrolytic polishing it has been possible to raise the gradient to 35 - 43 MV/m in single cell resonators. Here we report on the successful transfer of the electropolishing technique to multi-cell cavities. Presently four nine-cell cavities have achieved 35 MV/m, and a fifth cavity could be excited to 39 MV/m. In two high-power tests it could be verified that EP-cavities preserve their excellent performance after welding into the helium cryostat and assembly of the high-power coupler. One cavity has been operated for 1100 hours at the TESLA-800 gradient of 35 MV/m and 57 hours at 36 MV/m without loss in performance.

physics.acc-ph

Improved surface treatment of the superconducting TESLA cavities

The proposed linear electron-positron collider TESLA is based on 1.3 GHz superconducting niobium cavities for particle acceleration. For a centre-of-mass energy of 500 GeV, an accelerating field of 23.4 MV/m is required which is reliably achieved with a niobium surface preparation by chemical etching. An upgrade of the collider to 800 GeV requires an improved cavity preparation technique. In this paper, results are presented on single-cell cavities which demonstrate that fields of up to 40 MV/m are accessible by electrolytic polishing of the inner surface of the cavity.

physics.acc-ph