Safe Reconnection Time for Large-Scale Data Center Loads: An Analytical Framework for Transient Stability Assessment
The rapid growth of large, power electronics-rich data center loads (DCLs) is creating new operational challenges for bulk power systems. A key risk arises when a DCL's uninterruptible power supply (UPS) disconnects the facility during voltage/frequency disturbances and then reconnects it while the bulk grid is still dynamically settling to a new equilibrium point. Poorly timed reconnection can amplify electromechanical oscillations, deepen frequency deviations, and lead to repeated connect-disconnect flapping. In this paper, we develop an analytical framework to characterize the safe reconnection windows for large DCLs after a disturbance-induced disconnection that satisfy the prescribed limits. Using a model in the spirit of the classical single-machine infinite-bus system, we capture (i) swing dynamics during the disconnection interval and (ii) voltage-angle coupling at the load bus, which determines the electrical power step at reconnection under constant power load assumptions. Using the energy function method, we characterize the certified safe reconnection windows such that the post-reconnection trajectory is guaranteed to remain within operational limits (rotor speed/angle/voltage). Time-domain simulations validate the effectiveness of the proposed analytical approach. The results provide a simple physics-informed criterion that can be used to identify certified reconnection windows for large DCL facilities and inform UPS reconnection logic.