arXiv ScienceSearch

arXiv subjects

A. Shepherd

Publications and source records attributed to A. Shepherd.

3 recordsLinked to original sources

Direct current measurements of the SPIDER beam: a comparison to existing beam diagnostics

For negative ion beam sources there are several methods of measuring the accelerated beam current, most commonly electrical measurements at the power supply and calorimetric measurements. On SPIDER, the ITER Heating Neutral Beam full-scale beam source prototype, electrical measurements at the acceleration grid power supply (AGPS) are complemented by polarizing the diagnostic calorimeter STRIKE to provide an additional electrical measurement of the accelerated current. This is in addition to the calorimetric measurements provided by STRIKE. These diagnostics give differing measurements of the beam current. Exploiting the reduced number of open apertures on SPIDER a new beam diagnostic has been installed to measure the individual beamlet currents directly. The so called Beamlet Current Monitor (BCM) has been used to measure the current of five beamlets during the most recent SPIDER campaign. This work compares the BCM current to the electrical measurements at the AGPS and STRIKE. The average BCM current agrees well with the STRIKE electrical measurements, indicating that the AGPS overestimates the beam current. The individual beamlets are compared to the STRIKE calorimetric measurements, showing similar current trends with the source parameters.

physics.acc-ph

Spider Ion Source and Extraction Power Supplies -- An update of the design after four years of operation

SPIDER, the ion source prototype for ITER neutral beam injectors, has been in operation since 2018. The experiment includes a system of Ion Source and Extraction Power Supplies (ISEPS), whose design dates back to 2011. Since then the experience gained has led to substantial changes, the most dramatic modification being the complete replacement of the radiofrequency power supply, described elsewhere. This contribution details operating experience and calculations that have led to defining new requirements for a specific subset of power supplies, the bias power supplies. The bias power supplies perform the function of filtering out electrons extracted together with the negative ions and in the original 2011 ISEPS design are single quadrant resonant converters. For the two bias power supplies, the picture resulting from the review described in the paper is a substantial redesign, with the ability to operate in four quadrants and a twofold increase of the rated output voltage the most significant new specifications.

physics.plasm-ph

Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

ITER envisages the use of two heating neutral beam injectors plus an optional one as part of the auxiliary heating and current drive system. The 16.5 MW expected neutral beam power per injector is several notches higher than worldwide existing facilities. A Neutral Beam Test Facility (NBTF) was established at Consorzio RFX, exploiting the synergy of two test beds, SPIDER and MITICA. SPIDER is dedicated to developing and characterizing large efficient negative ion sources at relevant parameters in ITER-like conditions: source and accelerator located in the same vacuum where the beam propagates, immunity to electromagnetic interferences of multiple radio-frequency (RF) antennas, avoidance of RF-induced discharges on the outside of the source. Three years of experiments on SPIDER have addressed to the necessary design modifications to enable full performances. The source is presently under a long shut-down phase to incorporate learnings from the experimental campaign. Parallelly, developments on MITICA, the full-scale prototype of the ITER NBI featuring a 1 MV accelerator and ion neutralization, are underway including manufacturing of in-vessel components, while power supplies and auxiliary plants are already under final testing and commissioning. Integration, commissioning and tests of the 1MV power supplies are essential for this first-of-kind system, unparalleled both in research and industry field. The integrated test to confirm 1MV output by combining invertor systems, DC generators and transmission lines extracted errors/accidents in some components. To realize a concrete system for ITER, solutions for the repair and the improvement of the system were developed. Hence, NBTF is emerging as a necessary facility, due to the large gap with existing injectors, effectively dedicated to identify issues and find solutions to enable successful ITER NBI operations in a time bound fashion.

physics.plasm-ph