arXiv · physics/0407007
Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection
Abstract
To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6 or more Booster batches simultaneously; the first will be extracted to the antiproton source, while the remaining are extracted for the NuMI/MINOS (Neutrinos at the Main Injector / Main Injector Neutrino Oscillation Search) neutrino experiment. Performing this multi-batch operation while avoiding unacceptable radioactivation of the beamlines requires a previously unnecessary synchronization between the accelerators. We describe a mechanism and present results of advancing or retarding the longitudinal progress of the Booster beam by active feedback radial manipulation of the beam during the acceleration period.
Explore related subjects
Keep this discovery
R. Zwaska, S. Kopp, W. Pellico, R. Webber. 2004-07-01. Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection. https://arxiv.org/abs/physics/0407007
Cite the original work for its findings. Save a collection to share your selection of sources.