arXiv · 2611.26572
Optimal Scheduling of Multi-Site AI Data Centers in Day-Ahead Markets
Abstract
AI data centers are among the fastest-growing loads on the power grid, and their flexibility is increasingly sought by grid operators. Using it requires a model that links what an operator controls, namely GPU power caps, job timing and job placement, to the power drawn at each site and the electricity prices it faces. This paper develops such a framework for a multi-site AI data-center fleet. It represents GPU power-cap levels; deferrable jobs with deadlines and inference with response-time headroom; and site facility power, and casts the fleet schedule as a linear program solved on day-ahead prices. A year-long simulation on 2025 California Independent System Operator (CAISO) day-ahead prices in three data-center markets demonstrates the framework. Coordinated scheduling lowers the fleet's energy cost by 6.3% at equal work. Four operating modes, each adding one capability, split this saving into efficient GPU operation that needs no price signal, price response in time, and routing work between sites.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Xinyang Zhou, Guido Cavraro. 2026-11-19. Optimal Scheduling of Multi-Site AI Data Centers in Day-Ahead Markets. https://arxiv.science/abs/2611.26572
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite arXiv Science by Indiciae: BibTeX · RIS.