Low-Voltage Ride-Through in AI Data Centers via Coordinated Battery and Computing Load Control
Abstract
The ability of large AI data centers to ride through grid voltage sags is critical to power system stability and reliability. This paper frames data center low-voltage ride-through (LVRT) as a DC-link power balance problem. Once the rectifier reaches its current limit, the power drawn from the grid decreases in proportion to the grid voltage. The DC-link capacitor can supply the resulting power deficit only briefly before the DC-link voltage falls low enough to trigger undervoltage protection tripping. To address this issue, this paper proposes effective control strategies for coordinating uninterruptible power supply (UPS) battery and computing load curtailment to offset the power deficit and enable LVRT at minimum control cost. Three control scenarios are studied: UPS battery support alone, computing load curtailment alone, and the coordinated use of both resources. Electromagnetic transient (EMT) simulations using the TAMU-ERCOT AI data center model demonstrate that battery support and the coordinated strategy achieve LVRT for all tested sags, including a near-zero-voltage fault, while load curtailment alone rides through moderate voltage sags.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Xiaoyang Wang, Xin Chen, Fang Chen Lin, Prasad Enjeti, Ali Yazdanpanah, Yunzhi Cheng, Shri Abhyankar. 2026-11-14. Low-Voltage Ride-Through in AI Data Centers via Coordinated Battery and Computing Load Control. https://arxiv.science/abs/2611.19667
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite arXiv Science by Indiciae: BibTeX · RIS.