arXiv · 2610.03277
Monge matrix searching for lot sizing with piecewise-concave production costs
Abstract
We study single-item lot sizing with piecewise-concave production and holding--backlog costs over $T$ periods. Production has $m$ common positive finite breakpoints, and stock costs and domains have $K$ common finite boundary levels. For fixed $m,K$, we give an exact deterministic algorithm using $\OmK(T^{m+2}α(T+2))$ arithmetic operations and a Las Vegas algorithm using $\OmK(T^{m+2})$ expected operations, where $α$ is the inverse Ackermann function. The algorithms retain nonlinear concave cost pieces and cover backlogging, common-grid stock limits, and explicit terminal-stock policies. A structural decomposition at stock boundary levels yields breakpoint-only prefix and suffix tables. Batching transitions by a designated production period produces implicit matrices that are Monge double staircases on each production piece. Established matrix searches, merged state orders, and backward evaluation provide the bounds. A simpler rectangle/SMAWK variant requires $\OmK(T^{m+2}\log(T+2))$ operations. On 300 no-backlogging benchmark cases, its objectives agree exactly with the predecessor dynamic program and an inventory-state oracle. Geometric-mean paired time ratios are \GeoUncap\ for uncapacitated cases and \GeoCap\ for capacitated cases, with ratios above one favoring matrix searching. A 640-case base-model validation suite and a separate 624-case generalized-model suite pass. The timing study does not benchmark the generalized models or the stronger staircase routines. All bounds assume exact arithmetic, constant-time cost queries, and explicit closed-domain concavity conditions.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Kleitos Papadopoulos. 2026-10-02. Monge matrix searching for lot sizing with piecewise-concave production costs. https://arxiv.org/abs/2610.03277
Cite the original work for its findings. Save a collection to share your selection of sources.