arXiv · 2609.33493
An EPTAS for Offline Temporary Tasks Assignment on Few Machines
Abstract
In offline temporary tasks assignment, each job has a time interval and a positive weight and is assigned to one of $r$ identical machines for its entire interval; the goal is to minimize the peak load, the largest total weight of jobs that are simultaneously active on one machine. For every fixed $r$, we give an efficient polynomial-time approximation scheme (EPTAS) with running time $f(r,1/\varepsilon)\cdot N^{O(1)}$, where $N$ is the input length. The previous approximation scheme, by Azar, Regev, Sgall, and Woeginger (2002), runs in time $n^{O(r^3\log r/\varepsilon^3)}$ on $n$ jobs. We also show that for every fixed $r\ge2$ the problem is strongly NP-hard, so it has no FPTAS unless P=NP, and that under the Exponential Time Hypothesis no deterministic $(1+\varepsilon)$-approximation runs in time $2^{o(1/\varepsilon)}\cdot N^{O(1)}$. The key idea is to bound the loads of each group of simultaneously active jobs by a few weighted intervals whose positions are fixed in advance; a dynamic program over the time line then only has to record which machine carries each interval.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Junho Hwang. 2026-09-27. An EPTAS for Offline Temporary Tasks Assignment on Few Machines. https://arxiv.org/abs/2609.33493
Cite the original work for its findings. Save a collection to share your selection of sources.