The Proton Improvement Plan-II (PIP-II) project is under construction to provide the Fermilab Accelerator Complex with a new H$^-$ superconducting radiofrequency (SRF) linac and beam transfer line delivering 800 MeV protons at Booster injection at double energy and double intensity (6.7x10$^{12}$ protons per 20 Hz pulse) in comparison with the present Linac. The design goals of PIP-II Linac will be described, including delivering 1.2 kW beam power on Long Baseline Neutrino Facility (LBNF) target, continuous wave (CW) operation compatibility and future upgrades. The progress of the Linac construction and the development of the Commissioning Plan will be presented. Finally, the challenges of operating the SRF Linac to drive the Fermilab Booster will be addressed.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
O. Napoly. 2026-09-15. PIP-II Project Progress and Challenges. https://arxiv.org/abs/2609.17155
Cite the original work for its findings. Save a collection to share your selection of sources.