arXiv · 2501.02494
An Improved Metaheuristic Algorithm for On-site Workshop Availability Cost Problem
Abstract
The Multi-mode Resource Availability Cost Problem (MRACP) optimizes resource availability to minimize usage costs and is a recent project scheduling problem variant. The Multi-Mode On-Site Workshop Availability Cost Problem (MOSWACP) extends MRACP by introducing spatial constraints for On-site Workshops (OSWs) at construction sites. MOSWACP aims to determine the optimal availability level, installation, and dismantling times for OSWs while scheduling activities within spatial and resource limitations. A novel Mixed-Integer Linear Programming (MILP) model is developed, and a metaheuristic algorithm, the Electron Radar Search Algorithm (ERSA), is proposed to solve large-scale instances. ERSA, enhanced with problem-specific operators, outperforms CPLEX in large instances and outperforms Simulated Annealing (SA), Genetic Algorithm (GA), and Particle Swarm Optimization (PSO). An actual case study demonstrated significant cost savings using the proposed model. The results and conclusions highlight the effectiveness of the ERSA approach in managing complex project scheduling challenges.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Niloufar Mirzavand Boroujeni, Nima Moradi. 2025-01-05. An Improved Metaheuristic Algorithm for On-site Workshop Availability Cost Problem. https://arxiv.org/abs/2501.02494
Cite the original work for its findings. Save a collection to share your selection of sources.