arXiv · 2312.08166
Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab
Abstract
MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the US Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. This paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.
Explore related subjects
Keep this discovery
J. DiMarco, P. Akella, G. Ambrosio, M. Baldini, G. Chlachidze, S. Feher, J. Nogiec, V. Nikolic, S. Stoynev, T. Strauss, M. Tartaglia, P. Thompson, D. Walbridge. 2023-12-13. Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab. https://arxiv.org/abs/2312.08166
Cite the original work for its findings. Save a collection to share your selection of sources.