arXiv · 2211.07601
Switched max-plus linear-dual inequalities for makespan minimization: the case study of an industrial bakery shop
Abstract
In this paper, an industrial bakery shop is modeled by switched max-plus linear-dual inequalities (SLDIs). SLDIs are timed discrete event systems suitable for describing flow shops with time-window constraints and switching operating modes, where each mode corresponds to a job type. We consider the scheduling problem of minimizing the makespan of the shop, and we show that the application of methods based on the max-plus algebra leads to a faster solution compared to standard techniques. The results of the paper are general, in the sense that they can be applied to any permutation flow shop with time-window constraints.
Explore related subjects
Keep this discovery
Davide Zorzenon, Nataliia Zaiets, Jörg Raisch. 2022-11-14. Switched max-plus linear-dual inequalities for makespan minimization: the case study of an industrial bakery shop. https://doi.org/10.1016/j.ifacol.2023.10.038
Cite the original work for its findings. Save a collection to share your selection of sources.