arXiv · 2205.04092
Age-driven Joint Sampling and Non-slot Based Scheduling for Industrial Internet of Things
Abstract
Effective control of time-sensitive industrial applications depends on the real-time transmission of data from underlying sensors. Quantifying the data freshness through age of information (AoI), in this paper, we jointly design sampling and non-slot based scheduling policies to minimize the maximum time-average age of information (MAoI) among sensors with the constraints of average energy cost and finite queue stability. To overcome the intractability involving high couplings of such a complex stochastic process, we first focus on the single-sensor time-average AoI optimization problem and convert the constrained Markov decision process (CMDP) into an unconstrained Markov decision process (MDP) by the Lagrangian method. With the infinite-time average energy and AoI expression expended as the Bellman equation, the single-sensor time-average AoI optimization problem can be approached through the steady-state distribution probability. Further, we propose a low-complexity sub-optimal sampling and semi-distributed scheduling scheme for the multi-sensor scenario. The simulation results show that the proposed scheme reduces the MAoI significantly while achieving a balance between the sampling rate and service rate for multiple sensors.
Explore related subjects
Keep this discovery
Yali Cao, Yinglei Teng, Mei Song, Nan Wang. 2022-05-09. Age-driven Joint Sampling and Non-slot Based Scheduling for Industrial Internet of Things. https://doi.org/10.23919/jcc.ea.2021-0281.202401
Cite the original work for its findings. Save a collection to share your selection of sources.