arXiv ScienceSearch

arXiv · 1909.11086

A common approximation framework for the early work, the late work, and resource leveling problems with unit time jobs

Abstract

We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined as the sum of the portion of the jobs done after the due date. A related problem is the maximization of the early work, defined as the sum of the portion of the jobs done before the due date. We describe a polynomial time approximation scheme for the early work maximization problem, and we extended it to the late work minimization problem after shifting the objective function by a positive value that depends on the problem data. We also prove an inapproximability result for the latter problem if the objective function is shifted by a constant which does not depend on the input. These results remain valid even if the number of the jobs assigned to the same machine is bounded. This leads to an extension of our approximation scheme to some variants of the resource leveling problem, for which no approximation algorithms were known.

Explore related subjects

Keep this discovery

BibTeXRIS

Peter Gyorgyi, Tamas Kis. 2019-09-24. A common approximation framework for the early work, the late work, and resource leveling problems with unit time jobs. https://doi.org/10.1016/j.ejor.2020.03.032

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Quasi-Monte Carlo Beyond Hardy-Krause II: $(1 + \varepsilon)n$ Samples Suffice

Numerical integration studies how well one can estimate the integral of a function $f$ over $[0,1)^d$ using $n$ sample points. The two classical methods, Monte Carlo (MC) and quasi-Monte Carlo (QMC), have complementary strengths and weaknesses, and a fundamental question is to design an approach that combines the benefits of both. Recently, building on the transference principle in discrepancy theory, Bansal and Jiang~\cite{BJ25a} gave a randomized QMC method that bridges MC and QMC guarantees using only i.i.d.\ samples. Their method also goes beyond the classical Koksma--Hlawka inequality: it achieves integration error $\widetilde{O}_d(\sigma_{\mathsf{SO}}(f)/n)$, where the smoothed-out variation $\sigma_{\mathsf{SO}}(f)$ can be substantially smaller than the Hardy--Krause variation that governs the classical bound. However, their algorithm requires $n^2$ i.i.d.\ samples as input, and this quadratic blowup is inherent to any method based on the transference principle. In this work, we bypass the quadratic blowup: for any constant $\varepsilon > 0$, we show that $(1+\varepsilon)n$ i.i.d.\ samples suffice to both obtain the beyond-Hardy--Krause guarantee of~\cite{BJ25a}, resolving an open problem posed there, and to produce low-discrepancy point sequences. Our algorithms are variants of the online Haar-thinning method of Dwivedi, Feldheim, Gurel-Gurevich, and Ramdas~\cite{DFG+19}.

cs.DS

Single-Exponential Algorithms and a Polynomial Kernel for Strong Connectivity Augmentation

Strong Connectivity Augmentation (SCA) asks whether a directed acyclic graph can be made strongly connected by adding at most $k$ prescribed links whose total weight is within a given budget. Klinkby, Misra, and Saurabh (SODA 2021) gave an $O^*(2^{O(k\log k)})$-time algorithm and asked whether the problem admits a single-exponential parameterized algorithm and a polynomial kernel. We answer both questions affirmatively: SCA can be solved in $O^*(9^k)$ time and admits a polynomial kernel with $O(k^4)$ vertices and $O(k^{16})$ bits. For unweighted SCA, we obtain $O^*(4^k)$ time and a kernel with $O(k^3)$ vertices. Our algorithms are based on a particularly simple reduction to Strongly Connected Spanning Subgraph with two edge costs.

cs.DS