arXiv ScienceSearch

arXiv · 1909.08085

Prototype operations of atmospheric calibration devices for the Cherenkov Telescope Array

Abstract

The atmospheric monitoring devices for the planned calibration system of the Cherenkov Telescope Array (CTA) are undergoing intensive development, prototyping and testing. The All-Sky Cameras, the Sun/Moon Photometers and the FRAM telescopes have been gradually deployed at the future CTA sites with the primary goal of site characterization, simultaneously allowing the assessment of their operational reliability in realistic environmental conditions. All three devices have shown the ability to work smoothly in both the extreme dryness and the large temperature variations of the southern site as well as in the occasional adverse weather during winter months at the northern site. The target availability of 95\% of time has not yet been reached mostly due to minor hardware failures that have proven difficult to fix due to the remoteness of the installation in the absence of the future CTA infrastructure. The experience gathered during the prototype operations will contribute to the improved reliability of the final instruments. The Raman LIDARs, described in separate proceedings of this conference, and the infrared Ceilometer, ready for testing in Prague, will complement the set of atmospheric calibration devices in near future. The final operational procedures for the atmospheric calibration of the CTA during its operation are being finalized foreseeing the use of the All-sky Cameras and the Ceilometer for the monitoring of clouds over the whole sky and the LIDARs and FRAMs for precision measurements of the atmospheric transmission as a function of altitude and position within the field-of-view of the CTA array.

Explore related subjects

Keep this discovery

BibTeXRIS

Jan Ebr, Dušan Mandát, Miroslav Pech, Ladislav Chytka, Jakub Juryšek, Michael Prouza, Petr Janeček, Petr Trávníček, Jiří Blažek, Markus Gaug, Martin Mašek, Jiří Eliášek, Sergey Karpov. 2019-09-17. Prototype operations of atmospheric calibration devices for the Cherenkov Telescope Array. https://arxiv.org/abs/1909.08085

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM