arXiv · 1403.4819
Medium-term optimization of pumped hydro storage with stochastic intrastage subproblems
Abstract
This paper presents a medium-term self-scheduling optimization of pumped hydro storage power plants with detailed consideration of short-term flexibility. A decomposition of the problem into inter- and intrastage subproblems, where the intrastage problems themselves are formulated as multi-stage stochastic programs, allows the detailed consideration of short- term flexibility. The method is presented together with three alter- native approaches, where the short-term flexibility is considered differently: (1) with aggregated peak and off-peak prices, (2) with price duration curves and (3) with deterministic intrastage subproblems. The methods are compared and evaluated in a Monte Carlo operation simulation study. The study is performed on a realistic hydro power plant with consideration of revenue from ancillary services.
Explore related subjects
Keep this discovery
Hubert Abgottspon, Göran Andersson. 2014-03-19. Medium-term optimization of pumped hydro storage with stochastic intrastage subproblems. https://arxiv.org/abs/1403.4819
Cite the original work for its findings. Save a collection to share your selection of sources.