arXiv ScienceSearch

arXiv · 1307.2179

Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transportation Infrastructure Projects

Abstract

This paper examines three independent explanatory variables and their relation with cost overrun in order to decide whether this is different for Dutch infrastructure projects compared to worldwide findings. The three independent variables are project type (road, rail, and fixed link projects), project size (measured in terms of estimated costs) and the length of the project implementation phase. For Dutch projects, average cost overrun is 10.6% for rail, 18.6% for roads and 21.7% for fixed links. For project size, small Dutch projects have the largest average percentage cost overruns but in terms of total overrun, large projects have a larger share. The length of the implementation phase and especially the length of the pre-construction phase are important determinants of cost overruns in the Netherlands. With each additional year of pre-construction, percentage cost overrun increases by five percentage points. In contrast, the length of the construction phase has hardly any influence on cost overruns. This is an important contribution to current knowledge about cost overruns, because the period in which projects are most prone to cost overruns is narrowed down considerably, at least in the Netherlands. This means that period can be focused on to determine the causes and cures of overruns.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Chantal C. Cantarelli, Bert van Wee, Eric J. E. Molin, Bent Flyvbjerg. 2015-01-24. Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transportation Infrastructure Projects. https://doi.org/10.1016/j.tranpol.2012.04.002

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Prediction Markets Beat the Weather Forecast on Tomorrow's High Temperature

The sooner we receive information, and the more accurate it is, the better planning decisions we can make. Every day, prediction markets let anyone bet on tomorrow's high temperature in cities around the world, creating a market-implied forecast built on dispersed information. We use the past five years of market data from the Kalshi exchange for seven American cities to extract, hour by hour, the market-implied forecast. We use this forecast as a measuring instrument to see how much information about the temperature the market makes public before the public forecasting system does. We race it against the leading American and European weather forecasts. In six of the seven cities we study, the market beats the most accurate single public forecast, the National Blend of Models (NBM). Aggregating every city-day, at the end of the market's first hour of trading it beats the best single public product by about 10 percent in root-mean-square error, and holds its lead through the day, overnight, and into the target day. Looking at how the forecasts move over time, we find the National Blend travels four times further toward the market between its postings than the market travels toward the NBM. The market does not react to new weather forecast updates; instead, the forecast slowly publishes information that the market had already shared publicly.

q-fin.GN

Firm Valuation When AI Shapes the Business Model: A Milestone-Based Real-Options Framework for the AI Valuation Uncertainty Problem

Standard valuation methods, including discounted cash flow, the income approach standard IDW S 1 of the Institute of Public Auditors in Germany, and market multiples, compress milestone probabilities, continuation options, and risk shifts into opaque aggregate parameters; none provides a structured protocol for decomposing AI integration into auditable option-level assumptions. We propose an industry-agnostic taxonomy separating AI Integrators from AI Providers. AI Integrators are further classified by their Integration Depth Level, ranging from no integration to AI at the core of the product or process. A milestone-gated real-options overlay decomposes milestone state value into five components, and an Analytic Hierarchy Process-based Success Readiness Index derives per-option probabilities from structured pairwise comparisons for scenario analysis. Applied to an AI-native energy software-as-a-service firm, the framework yields a coherent valuation band traceable to identifiable option-level assumptions. Risk concentrates in later-stage continuation options, matching the structural prediction for AI Providers. The protocol applies across the firm lifecycle, including mergers and acquisitions due diligence. The case is a single-firm demonstration of protocol coherence, not empirical validation; multi-case testing against realised post-exit valuations is left to future research.

q-fin.GN

Machine Learning Classification and Portfolio Construction: Does the Loss Function Matter?

Classification outperforms regression across matched machine learning models in portfolio construction. A stacking ensemble of gradient boosted trees, random forest, and neural network yields a value-weighted annualized Sharpe ratio of 2.08 for classification and 1.39 for regression. This outperformance strengthens with class granularity and persists across subsamples and after transaction costs. Spanning tests show that classification retains economically large alphas after we control for regression, whereas regression alphas shrink substantially once we control for classification. These results indicate that classification extracts more return information than matched regression. Our diagnostics trace classification's advantage to more precise separation of return deciles.

q-fin.GN