Lock-in and Its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects. Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns

Abstract

Lock-in, the escalating commitment of decision-makers to an ineffective course of action, has the potential to explain the large cost overruns in large scale transportation infrastructure projects. Lock-in can occur both at the decision-making level (before the decision to build) and at the project level (after the decision to build) and can influence the extent of overruns in two ways. The first involves the methodology of calculating cost overruns according to the formal decision to build. Due to lock-in, however, the real decision to build is made much earlier in the decision-making process and the costs estimated at that stage are often much lower than those that are estimated at a later stage in the decision-making process, thus increasing cost overruns. The second way that lock-in can affect cost overruns is through practice. Although decisions about the project (design and implementation) need to be made, lock-in can lead to inefficient decisions that involve higher costs. Sunk costs (in terms of both time and money), the need for justification, escalating commitment, and inflexibility and the closure of alternatives are indicators of lock-in. In this paper, two case studies, of the Betuweroute and the HSL-South projects in the Netherlands, demonstrate the presence of lock-in and its influence on the extent of cost overruns at both the decision-making and project levels. This suggests that recognition of lock-in as an explanation for cost overruns significantly contributes to the understanding of the inadequate planning process of projects and allows development of more appropriate means.

Explore related subjects

Keep this discovery

BibTeXRIS

Chantal C. Cantarelli, Bent Flybjerg, Bert van Wee, Eric J. E. Molin. 2013-07-08. Lock-in and Its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects. Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns. https://doi.org/10.1068/b36017

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

AI for AI: Optimizing Additional Infrastructure Build-out to Power Artificial Intelligence Data Centers

The twenty-first century's transformative technology, artificial intelligence, is increasingly constrained by the twentieth century's transformative technology, the electricity grid. Rapid growth in electricity demand from data centers is leading to higher electricity prices, without a compensating supply-side response. We develop a framework linking data-center load growth, available generation capacity, and market-clearing prices to understand this phenomenon. We first analyze a deterministic model to show how differing estimates of demand and supply growth rates affect prices. We then model the expansion of new data centers and their associated electricity demand, together with build-outs of new electricity supply, as stochastic processes,resulting in probabilistic distributions of supply, demand, and prices rather than a single forecast. Finally, we formulate generation expansion as a stochastic control problem in which a revenue-maximizing investor dynamically chooses the intensity of supply-side investments. The analysis highlights a central challenge of the data-center build-out: even when rapid demand growth increases the need for new generation, the uncertainties related to load forecasts, development execution risks, and value cannibalization from overbuilding capacity may weaken incentives to invest at the pace required to keep electricity prices stable.

q-fin.GN

Measuring DeFi Risk

Decentralized finance (DeFi) lending has grown from nonexistent in 2017 to nearly 40 billion US Dollars in deposited funds in May 2022. Using cryptocurrency as collateral, the platforms match speculative margin trading with yield-seeking depositors lending coins pegged to the dollar (stable coins). Depositors receive claims guaranteed by a basket of collateral, akin to new stable coins. We develop a framework requiring only knowledge of aggregate deposits and borrowings to measure overall system risks to lenders and borrowers. Using evidence from major protocols, the measures identify an increase in system fragility beyond prudent levels around mid 2021, with a potential loss of peg for extreme variations in coin prices. Overall, the model offers an easily implementable aggregate risk metric capturing the perspectives of synthetic investors and offers early warning signals as the industry is moving from deposits guaranteed by collateral to fiat money.

q-fin.GN

Historical Reflections on Interest Rates and the Emergence of the Yield Curve

This text grew out of a historical introduction initially written for a study of interest rates in cryptocurrency markets. The difficulty of defining a term structure for a currency without a conventional bond market led naturally to a more fundamental question: under what historical conditions does a yield curve become observable at all? Credit existed long before modern money, and interest-bearing loans are documented as early as ancient Mesopotamia. For much of history, the surviving evidence lacks the institutional features that facilitate reliable comparisons of interest rates by maturity: standardised debt instruments, sufficiently homogeneous borrowers, regular issuance over a range of maturities, observable market prices, and liquid secondary markets. We trace the gradual emergence of these conditions from ancient Mesopotamia, Greece, and Rome, through medieval and early modern Europe, to the development of modern sovereign debt markets in the nineteenth and twentieth centuries.

q-fin.GN